Bid Sheet
Takeoff  🔒

ROLL-UP

Budgeted = direct cost across all tasks · Drawn = actuals · Bid = budget × profit % (global default, override per task)
Total budgeted (cost)
$0
Bid total
$0
Drawn to date
$0
Remaining budget
$0
Budget consumed
0%
Total budgeted direct cost$0
Bid Total default profit % $0
Resulting margin on price0%

BILL OF QUANTITIES

Open a task → add cost-code blocks (duplicate to repeat a table) · set lift thickness → block repeats per lift · build trucking from the matrix

BUDGET BY COST CODE

Every block rolled up to its cost code — the numbers you feed your software
CodeDescriptionBudgetedDrawnRemainingUsed
WHAT'S NEW IN r3
  • Duplicate cost-code blocks: a task can hold several code blocks — duplicate to repeat a table (e.g. 80mm = 7220, 25mm = 7230).
  • Lifts: enter total + max lift thickness → block repeats per lift (full rehandle).
  • Crew hours per resource are editable; set a task production rate to back-check hours.
  • Trucking matrix: pick truck configs → trips, fleet capacity, job hours, and trucking $.

Takeoff — locked

Drawing-takeoff entry. Enter the password to unlock data entry.

⚠ Soft gate only — a password inside a downloadable file is not real security. The deployed version on gethaul.ca uses real login (see README).

HAUL Bid Sheet

Sign in to continue.